Tender & Estimating Software for Civil Contractors
My Trade Hub is estimating and tendering software for civil contractors that automates the quantity takeoff and pricing from your civil design plans — bulk earthworks, cut and fill, pavement layers, stormwater and sewer drainage, and services trenching — so you can turn a design package into a priced, tender-ready submission far faster than measuring it by hand. It is built for Australian civil and infrastructure work, and every measured quantity stays fully editable so you keep control of your rates and margin.
Key takeaways
- My Trade Hub automates civil takeoff from design drawings — earthworks volumes, pavement areas, drainage lengths and services trenching — so nothing gets missed across a large site.
- Automated takeoff is 60-75% faster than manual estimation, which matters most on civil tenders with tight closing dates and thousands of measured line items.
- Every measured quantity stays editable, so you apply your own rates for plant, labour and haulage and keep full control of the final price.
- Civil work is almost always won by formal tender against engineering drawings and, on larger jobs, a Bill of Quantities issued by the principal or their superintendent.
- The same measured quantities that build the tender price carry through to progress claims and variations once earthworks are under way.
Why civil estimating takes so long
Civil estimating takes so long because a single design package covers an entire site rather than one structure, and every element — the existing ground, the design levels, the pavement build-up, the pipe network — has to be measured and cross-checked before a rate can be applied to any of it.
Bulk earthworks alone means comparing existing survey levels against design levels across the whole site to calculate cut and fill volumes, then accounting for swell, compaction and haulage distance to the nearest cut-to-fill balance or spoil site. Layered on top of that are pavement areas and depths, stormwater and sewer pipe networks with their own pits, structures and levels, and services trenching for power, water and telecommunications conduits — each measured to its own unit and each capable of quietly blowing out a tender if under-counted.
For a civil estimator working from PDF drawings and CAD files by hand, that means days spent scaling levels and areas off plan sets before a single line of the price build-up can start — time that is in direct competition with a tender closing date that rarely moves.
What’s in a civil takeoff
A civil takeoff is the measured volume, area, length and count of every element of earthworks and infrastructure shown on the design drawings, broken down so each can be priced with plant, labour, materials and haulage. A complete civil takeoff typically covers:
- Bulk earthworks — cut and fill volumes calculated from existing and design surface levels, topsoil strip and respread, and site regrading.
- Pavement and subgrade — subgrade preparation, sub-base and base course layers, and sealed or unsealed pavement areas measured by depth and area.
- Stormwater and sewer drainage — pipe lengths by diameter and material, pits, headwalls and connections, measured to the relevant standard method.
- Services and trenching — trench excavation and backfill for power, water, gas and telecommunications conduits, measured in lineal metres.
- Kerb, footpath and ancillary works — kerb and channel, concrete or asphalt footpaths, line marking and signage.
How My Trade Hub takes off civil work from your plans
My Trade Hub’s estimation engine reads your civil design drawings and performs the measured takeoff automatically — calculating earthworks volumes from level data, measuring pavement areas by layer, and taking off drainage and services lengths — instead of an estimator scaling every level and dimension off the plan set by hand.
Because the takeoff is automated rather than manual, it runs 60-75% faster than measuring the same design package by hand, which is the difference between comfortably meeting a tender closing date and rushing the final pricing overnight.
The output is a structured, itemised schedule of civil quantities — organised by earthworks, pavement, drainage and services — not a single black-box total, so an estimator can review and adjust every line before a rate is ever applied.
Pricing civil work: plant, labour, haulage and margin
Once quantities are measured, pricing civil work means building up a rate for each item from plant hire or ownership cost, labour, materials and haulage — civil rates are unusually sensitive to plant productivity and cartage distance, which a generic trade rate never captures.
Earthworks rates depend heavily on machine size and productivity, ground conditions, and how far cut material has to be hauled to fill or to a spoil site — a longer haul cycle changes the whole rate, not just the transport line. Drainage and services rates need to reflect trench depth, shoring or battering requirements, and dewatering where the water table is shallow.
On top of plant, labour, materials and haulage, add overheads and margin, and build in a realistic allowance for traffic management, environmental controls and any geotechnical conditions flagged in the site investigation report.
| Item | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Bulk excavation, cut to fill | m³ | 4,200 | $18.50 | $77,700 |
| 2 | Sub-base course, 150mm compacted | m² | 3,600 | $22.00 | $79,200 |
| 3 | Stormwater pipe, RC 375mm dia. | m | 340 | $285.00 | $96,900 |
| 4 | Trench excavation & backfill, services | m | 520 | $65.00 | $33,800 |
From estimate to a professional civil tender
With earthworks, pavement, drainage and services quantities measured and priced, the next step is assembling that pricing into a complete tender submission against the principal’s conditions of tendering — usually a priced Bill of Quantities alongside methodology, program and compliance documentation.
My Trade Hub turns the priced takeoff straight into a structured, client-ready tender document, so the same measured quantities that built the price also populate the priced schedule you lodge, rather than being re-keyed into a separate document under deadline pressure.
Because the slow part — measuring the site — is already done, the remaining tender effort goes into methodology, program and risk allowances, which is exactly where a civil tender is genuinely won or lost.
Quoting vs tendering for civil work
Civil contractors occasionally quote small, clearly scoped jobs directly — a driveway crossover, a small stormwater connection, minor site regrading for a single client — but the great majority of civil and infrastructure work is won through formal tender.
A civil tender is typically issued by a developer, principal contractor, utility authority or council, against engineering design drawings and specification, often with a Bill of Quantities that fixes the measured quantities so every tenderer prices the identical scope. Larger infrastructure and subdivision works add earthworks reports, geotechnical data and environmental conditions that all need to be priced into the submission.
The estimating principle stays the same either way — measure the design accurately, then price it — but a civil tender demands a far more rigorous program, plant schedule and risk allowance than a quote, since site conditions and haulage assumptions can make or break the margin on works this scale.
Common mistakes in civil estimating
Most civil under-quotes come down to a short list of recurring mistakes, almost all of which trace back to time pressure on a large, complex measurement task.
- Under-estimating haulage distance or cycle time, which quietly inflates every cubic metre of cut and fill on the job.
- Missing the swell and compaction factors that convert an in-situ excavation volume into the actual volume of material handled and placed.
- Not allowing for rock, groundwater or contaminated material flagged in the geotechnical report, which changes both plant selection and rate.
- Under-pricing traffic management and environmental controls on projects near live roads or waterways.
- Pricing from an earlier design revision, so measured quantities no longer match the latest issued-for-construction drawings.
Who prepares civil estimates
On larger civil and infrastructure tenders, a dedicated civil estimator or quantity surveyor prepares the takeoff and price build-up, working closely with a plant and construction manager who understands real machine productivity and site logistics for the specific ground conditions.
On smaller civil businesses, the owner or a senior foreman often estimates the job themselves between running current sites — which is exactly when the sheer volume of measurement in a civil design package becomes the bottleneck, since there is rarely spare time to scale levels and areas by hand between site visits.
Either way, the underlying problem is the same: someone has to measure a whole site’s worth of earthworks, pavement and drainage before pricing can begin, which is precisely the step My Trade Hub automates.
How My Trade Hub helps civil contractors win more work
My Trade Hub automates the measured takeoff for civil work directly from your design drawings — bulk earthworks and cut/fill volumes, pavement layers, stormwater and sewer drainage, and services trenching — so the slowest, most error-prone part of civil estimating happens in a fraction of the time it takes by hand.
Every measured quantity stays fully editable, so you apply your own plant, labour and haulage rates and keep complete control of the final tender price. Because the takeoff runs 60-75% faster than manual estimation, you can chase more civil tenders without expanding your estimating team, and the same measured quantities carry through to progress claims and variations once earthworks start on site.
Frequently asked questions
what’s the best estimating software for civil contractors?
The best estimating software for civil contractors automates the quantity takeoff from your design drawings — earthworks volumes, pavement areas, drainage lengths and services trenching — rather than relying on generic per-square-metre pricing. My Trade Hub performs that takeoff automatically from your civil plans and produces a structured, tender-ready price schedule, while keeping every quantity and rate editable so your plant, labour and haulage rates stay under your control.
how do civil contractors calculate cut and fill?
Cut and fill is calculated by comparing existing ground levels against the design surface across the site, working out the volume of material to be removed (cut) and placed (fill), then applying swell and compaction factors to convert that into real handled volumes for plant and haulage pricing. Doing this by hand from survey and design levels is slow; My Trade Hub calculates these volumes automatically from the design drawings.
how long does it take to price a civil tender?
A manual civil takeoff and price build-up can take anywhere from several days for a small subdivision stage to weeks for a large infrastructure project, given the volume of earthworks, pavement and drainage measurement involved. Automating the takeoff cuts that time by 60-75%, freeing up the remaining tender period for methodology, program and risk pricing.
what should be included in a civil tender submission?
A complete civil tender submission typically includes a priced Bill of Quantities or schedule of rates covering earthworks, pavement, drainage and services, a construction methodology and program, plant and resource schedules, insurances and licences, a WHS and environmental management plan, and any allowances for identified geotechnical or site risk.
do civil contractors quote or tender?
The great majority of civil and infrastructure work is won by formal tender against engineering design drawings, often with a Bill of Quantities issued by the principal or their superintendent. Small, clearly defined jobs for a single client — like a driveway crossover or minor site regrading — are sometimes priced as a direct quote instead.
how do I estimate drainage and services trenching?
Drainage and services trenching are estimated by measuring pipe or conduit lengths and diameters from the design drawings, then pricing trench excavation, bedding, pipe supply and backfill against depth, ground conditions and any shoring or dewatering required. My Trade Hub measures these lengths automatically as part of the civil takeoff, ready for your own plant and labour rates.
Ready to win more work?
Turn your plans into professional tenders 60–75% faster with My Trade Hub. Plans built around your tendering volume — no lock-in contracts.
Get started free