Tender & Estimating Software for Roofers
My Trade Hub is estimating and tendering software for roofing contractors that automates the quantity takeoff and pricing from your plans — roof area, sheeting and flashings, guttering and downpipes, and insulation — so you can turn a set of drawings into a client-ready quote or tender in minutes rather than hours. It is built for Australian roofing and roof plumbing work, and every measured item stays editable so you keep full control of your rates and margin.
Key takeaways
- My Trade Hub automates the roofing takeoff from your plans — roof area, sheeting, flashings, guttering and insulation — so nothing gets missed or double-counted.
- Automated takeoff is 60-75% faster than manual estimation, so you can quote more jobs without adding admin time.
- Every measured quantity stays editable, so you apply your own rates and margin and keep full control of the final price.
- Residential reroofs and new-build roofing are usually quoted directly; larger commercial and multi-unit roofing packages are won by formal tender against a building designer’s roof plan.
- The same measured quantities that build your quote carry through to variations and progress claims once the job is under way.
Why roofing estimating takes so long
Roofing estimating takes so long because a roof plan shows a flat projection of a sloped surface, and converting that plan area into the real, pitched roof area — then adding sheeting laps, flashings and guttering — is a fiddly, error-prone calculation to do by hand.
Unlike a simple floor area, roof scope has to account for pitch, hips, valleys and ridge lines, plus a separate reckoning for guttering and downpipes, flashings at every junction, and insulation or sarking underneath. Reading all of that off a roof plan and set of elevations and tallying it by hand in a spreadsheet is slow, and it is easy to under-measure a complex hip-and-valley roof.
For most roofing contractors, that means estimating gets pushed to evenings and weekends, or rushed to meet a deadline — which is exactly when the pitch factor and flashing detail get missed and jobs get under-priced.
What’s in a roofing takeoff
A roofing takeoff is the measured area and length of every roof and roof plumbing item shown on the plans, broken down so each can be priced with materials and labour. A complete takeoff typically covers:
- Roof sheeting area — the actual pitched area of every roof plane, not the flat plan area, measured by sheeting profile.
- Ridge capping, barge and fascia — the lineal metres of trim along every ridge, hip, barge and fascia line.
- Guttering and downpipes — gutter length by profile, plus the number and length of downpipes and their stormwater connections.
- Flashings — valley, apron, chimney and penetration flashings at every roof junction and service penetration.
- Insulation and safety items — sarking or blanket insulation area, safety mesh, and roof vents or whirlybirds.
How My Trade Hub takes off roofing work from your plans
My Trade Hub’s estimation engine reads your roof plan and elevations and performs the measured takeoff automatically — converting plan area to true pitched roof area, measuring guttering and flashing lengths, and counting penetrations and vents — instead of you calculating pitch factors and scaling drawings by hand.
Because the takeoff is automated rather than manual, it is 60-75% faster than estimating the same job by hand, so you can turn a set of plans into priced quantities the same day you receive them rather than setting aside a weekend.
The output is a structured, itemised list of roofing quantities — not a black-box total — so you can review every line, roof plane by roof plane, before it goes anywhere near a client.
Pricing roofing work: rates, labour and margin
Once the areas and lengths are measured, pricing a roofing job means applying a materials rate and a labour rate to every roof plane, gutter run and flashing, then adding overheads and margin on top — the takeoff only gets you halfway to a number you can stand behind.
Labour is usually driven as much by access and safety as by area — pitch, roof height, and whether scaffolding or harness anchor points are needed all add cost that a flat rate per square metre will not capture, so your rates need to reflect the real site conditions.
On top of materials and labour, add your overheads and margin, and factor in a realistic sheeting wastage allowance for cutting to hips, valleys and penetrations, plus the cost of safety access and any weather-day risk.
| Item | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Colorbond roof sheeting, corrugated | m² | 210 | $58.00 | $12,180 |
| 2 | Ridge and hip capping | m | 38 | $22.00 | $836 |
| 3 | Quad gutter, supply & install | m | 46 | $32.00 | $1,472 |
| 4 | Downpipes incl. stormwater connection | No | 6 | $185.00 | $1,110 |
From estimate to a professional quote or tender
With the roofing quantities measured and priced, the next step is turning that pricing into a document a client or head contractor can actually act on — a clear, professional quote for direct work, or a complete tender submission for competitive commercial jobs.
My Trade Hub turns the priced takeoff straight into a client-ready quote or tender, with your branding and terms attached, so you are not re-keying the same numbers into a separate Word document or spreadsheet.
Because the slow part — the takeoff — is already done, producing the quote itself takes minutes, which means you can turn quotes around the same day a roof plan lands in your inbox.
Quoting vs tendering for roofing work
Most roofing contractors move between two very different pricing situations, and knowing which one you are in changes how you should price the job.
A straightforward quote — a reroof, a new-home roof, a storm damage repair — is usually priced directly for the homeowner or head contractor as a fixed price with a short list of inclusions and exclusions. A commercial or multi-unit tender is more formal: you are usually pricing against a building designer’s or architect’s roof plan and specification, sometimes with a Bill of Quantities, alongside other roofing subcontractors.
The estimating principle is the same in both cases — measure the roof accurately, then price it — but a tender demands more supporting documentation and a tighter, more competitive rate, since you are one of several contractors bidding the identical scope.
Common mistakes in roofing estimating
Most roofing under-quotes come down to a short list of recurring mistakes, all of which are avoidable with a consistent takeoff process.
- Measuring the flat plan area instead of the true pitched area, which under-counts sheeting on anything steeper than a low pitch.
- Missing valley and apron flashings at roof junctions, which are easy to overlook next to the more obvious sheeting area.
- Underestimating access and safety costs — scaffolding, harness anchor points and safety mesh — on steep or high roofs.
- Forgetting stormwater connections for downpipes, which can add unexpected civil works cost if not priced up front.
- Pricing from an outdated roof plan revision, so the sheeting profile or roof shape in the quote no longer matches what is being built.
Who prepares roofing estimates
On most residential and small commercial jobs, the roofer who will do the work also prices it — reading the plans, measuring the roof and building the quote themselves, since a separate estimator is rarely justified for a job of that size.
On larger commercial and multi-unit projects, a dedicated estimator or contracts manager inside the roofing contracting business usually prepares the tender, often working from a head contractor’s program and a designer’s roof plan rather than site knowledge alone.
Either way, the same bottleneck applies: someone has to manually convert plan area to pitched area and scale every gutter and flashing length off a drawing before a single rate can be applied, which is exactly the step My Trade Hub automates.
How My Trade Hub helps roofers win more work
My Trade Hub automates the measured takeoff for roofing work directly from your plans — true pitched roof area, sheeting, flashings, guttering and insulation — so the slow, error-prone part of estimating happens in minutes instead of hours.
Every measured item stays fully editable, so you apply your own rates and margin and keep complete control of the final price before it goes to a client. Because the takeoff is 60-75% faster than doing it by hand, you can quote and tender for more roofing work without adding estimating overhead — and the same measured quantities carry through to variations and progress claims once the job starts.
Frequently asked questions
what’s the best estimating software for roofers?
The best estimating software for roofers automates the quantity takeoff from your plans — true pitched roof area, sheeting, flashings and guttering — and lets you apply your own rates rather than relying on generic pricing. My Trade Hub performs that takeoff automatically and produces a client-ready quote or tender, while keeping every rate and quantity editable so you stay in control of the final price.
how do roofers price a job?
Roofers price a job by converting the roof plan area to the true pitched area, measuring sheeting, flashings, guttering and downpipes, applying materials and labour rates, then adding overheads, access costs and margin. Automating the takeoff from the plans removes the pitch miscalculations and missed flashings that are the most common cause of under-pricing.
how long does it take to quote a roofing job?
A manual roofing takeoff and quote can take anywhere from an hour for a simple reroof to a full day or more for a larger or more complex roof shape, depending on how many hips, valleys and penetrations need to be measured by hand. Automating the takeoff cuts that time by 60-75%, so a job that used to take a day can be quoted the same afternoon.
what should be included in a roofing quote?
A complete roofing quote should list the scope of work (roof area, sheeting profile, flashings, guttering and downpipes), the price, what is included and excluded, any allowance for access and safety equipment, and the validity period of the price.
do roofers need to tender for commercial work?
Larger commercial and multi-unit roofing packages are usually won by formal tender rather than a simple quote, particularly where a head contractor or client is comparing several roofing subcontractors against the same roof plan and specification. Smaller commercial and all residential work is typically priced as a straightforward quote.
how do you calculate roof area for a quote?
Roof area for a quote is calculated by taking the flat plan area of each roof plane and adjusting it for the roof pitch, since a sloped roof always has more actual surface area than its plan projection suggests. Doing this by hand for a roof with multiple pitches, hips and valleys is slow and error-prone; My Trade Hub calculates the true pitched area automatically as part of the takeoff.
Ready to win more work?
Turn your plans into professional tenders 60–75% faster with My Trade Hub. Plans built around your tendering volume — no lock-in contracts.