Tender & Estimating Software for Tilers
My Trade Hub is estimating and tendering software for tiling contractors that automates the quantity takeoff and pricing from your plans — floor and wall tile areas, waterproofing membrane, and screeds and falls — so you can turn a set of drawings into a client-ready quote or tender in minutes rather than hours. It is built for Australian tiling and waterproofing work, and every measured item stays editable so you keep full control of your rates and margin.
Key takeaways
- My Trade Hub automates the tiling takeoff from your plans — floor and wall areas, waterproofing, screeds and wastage — so nothing gets missed or double-counted.
- Automated takeoff is 60-75% faster than manual estimation, so you can quote more jobs without adding admin time.
- Every measured quantity stays editable, so you apply your own rates and margin and keep full control of the final price.
- Residential bathroom and kitchen tiling is usually quoted directly; larger commercial and multi-residential tiling packages are won by formal tender against an architect’s finishes schedule.
- The same measured quantities that build your quote carry through to variations and progress claims once the job is under way.
Why tiling estimating takes so long
Tiling estimating takes so long because a single set of plans can hide dozens of separate floor and wall areas, each with a different tile, substrate and waterproofing requirement — a missed wall upturn or an under-counted wastage allowance quietly erodes the margin on the whole job.
Unlike a single bulk trade quantity, tiling scope is spread across bathrooms, kitchens, laundries, alfresco areas and feature walls, each measured separately by area, with its own tile size, lay pattern and substrate. Reading all of that off an architect’s finishes schedule or a set of floor plans and tallying it by hand in a spreadsheet is slow, and it is easy to lose track of which room needs which tile partway through a job.
For most tiling contractors, that means estimating gets pushed to evenings and weekends, or rushed to meet a deadline — which is exactly when waterproofing upturns and wastage allowances get missed and jobs get under-priced.
What’s in a tiling takeoff
A tiling takeoff is the measured area and count of every tiled surface shown on the plans, broken down so each can be priced with materials, wastage and labour. A complete takeoff typically covers:
- Floor tile areas — bathrooms, kitchens, laundries, living areas and alfresco spaces, measured in square metres by room.
- Wall tile areas — shower recesses, splashbacks, feature walls and full-height wet areas, including upturns and skirting.
- Waterproofing — membrane area to floors and wall upturns in wet areas, measured to the relevant Australian Standard.
- Screeds and falls — bedding and screeding to floor wastes, and any levelling compound needed on the substrate.
- Trims, movement joints and grout — edge trims, expansion joints, and the grout and adhesive quantities for each area.
How My Trade Hub takes off tiling work from your plans
My Trade Hub’s estimation engine reads your architectural plans and finishes schedule and performs the measured takeoff automatically — calculating floor and wall tile areas room by room, and flagging waterproofing and screed requirements — instead of you scaling them off the drawings by hand.
Because the takeoff is automated rather than manual, it is 60-75% faster than estimating the same job by hand, so you can turn a set of plans into priced quantities the same day you receive them rather than setting aside a weekend.
The output is a structured, itemised list of tiling quantities — not a black-box total — so you can review every line, room by room, before it goes anywhere near a client.
Pricing tiling work: rates, labour and margin
Once the areas are measured, pricing a tiling job means applying a materials rate and a labour rate to every floor and wall area, then adding overheads and margin on top — the takeoff only gets you halfway to a number you can stand behind.
Labour is usually the larger cost on tiling work, and it varies with tile size and lay pattern — a large-format, low-lippage floor or a herringbone feature wall takes considerably longer to lay than a simple grid pattern — plus substrate condition and how much cutting and setout the room demands.
On top of materials and labour, add your overheads and margin, and factor in a realistic wastage allowance — higher for diagonal or herringbone lay and for tiles cut around fixtures — plus waterproofing and screeding as separate priced items.
| Item | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Floor tiling, 600x600 porcelain | m² | 42 | $95.00 | $3,990 |
| 2 | Wall tiling, shower recess | m² | 18 | $110.00 | $1,980 |
| 3 | Waterproofing membrane, wet areas | m² | 26 | $48.00 | $1,248 |
| 4 | Screed to falls, floor wastes | m² | 8 | $65.00 | $520 |
From estimate to a professional quote or tender
With the tiling areas measured and priced, the next step is turning that pricing into a document a client or head contractor can actually act on — a clear, professional quote for direct work, or a complete tender submission for competitive commercial jobs.
My Trade Hub turns the priced takeoff straight into a client-ready quote or tender, with your branding and terms attached, so you are not re-keying the same numbers into a separate Word document or spreadsheet.
Because the slow part — the takeoff — is already done, producing the quote itself takes minutes, which means you can turn quotes around the same day a set of plans or a finishes schedule lands in your inbox.
Quoting vs tendering for tiling work
Most tiling contractors move between two very different pricing situations, and knowing which one you are in changes how you should price the job.
A straightforward quote — a bathroom renovation, a kitchen splashback, an alfresco floor — is usually priced directly for the homeowner or head contractor as a fixed price with a short list of inclusions and exclusions. A commercial or multi-residential tender is more formal: you are usually pricing against an architect’s finishes schedule and specification, sometimes with a Bill of Quantities, alongside other tiling subcontractors.
The estimating principle is the same in both cases — measure the areas accurately, then price them — but a tender demands more supporting documentation and a tighter, more competitive rate, since you are one of several contractors bidding the identical scope.
Common mistakes in tiling estimating
Most tiling under-quotes come down to a short list of recurring mistakes, all of which are avoidable with a consistent takeoff process.
- Under-allowing for wastage on diagonal, herringbone or large-format lay, where cutting losses run well above a standard grid pattern.
- Missing wall upturns and waterproofing to wet areas, which are compulsory but easy to leave off a quick floor-area measurement.
- Not accounting for substrate preparation — levelling compound or screeding — on an uneven or out-of-level floor.
- Forgetting movement joints and trims, which add up across a large area and are often specified but not drawn explicitly.
- Pricing from an outdated finishes schedule, so the tile selection or area in the quote no longer matches the current drawings.
Who prepares tiling estimates
On most residential and small commercial jobs, the tiler who will do the work also prices it — reading the plans, measuring the areas and building the quote themselves, since a separate estimator is rarely justified for a job of that size.
On larger commercial and multi-residential projects, a dedicated estimator or contracts manager inside the tiling contracting business usually prepares the tender, often working from a head contractor’s program and an architect’s finishes schedule rather than site knowledge alone.
Either way, the same bottleneck applies: someone has to manually measure every floor and wall area off a drawing before a single rate can be applied, which is exactly the step My Trade Hub automates.
How My Trade Hub helps tilers win more work
My Trade Hub automates the measured takeoff for tiling work directly from your plans — floor and wall areas, waterproofing, screeds and wastage — so the slow, error-prone part of estimating happens in minutes instead of hours.
Every measured item stays fully editable, so you apply your own rates and margin and keep complete control of the final price before it goes to a client. Because the takeoff is 60-75% faster than doing it by hand, you can quote and tender for more tiling work without adding estimating overhead — and the same measured quantities carry through to variations and progress claims once the job starts.
Frequently asked questions
what’s the best estimating software for tilers?
The best estimating software for tilers automates the quantity takeoff from your plans — floor and wall areas, waterproofing and wastage — and lets you apply your own rates rather than relying on generic pricing. My Trade Hub performs that takeoff automatically and produces a client-ready quote or tender, while keeping every rate and quantity editable so you stay in control of the final price.
how do tilers price a job?
Tilers price a job by measuring the floor and wall areas, applying a materials and labour rate to each area, adding a wastage allowance for cutting losses, then pricing waterproofing and screeding separately before adding overheads and margin. Automating the takeoff from the plans removes the missed upturns and areas that are the most common cause of under-pricing.
how long does it take to quote a tiling job?
A manual tiling takeoff and quote can take anywhere from an hour for a single bathroom to a full day or more for a larger home or commercial fit-out, depending on how many rooms and tile types need to be measured by hand. Automating the takeoff cuts that time by 60-75%, so a job that used to take a day can be quoted the same afternoon.
what should be included in a tiling quote?
A complete tiling quote should list the scope of work (floor and wall areas, tile type, waterproofing and screeding), the price, what is included and excluded, a wastage allowance, any provisional allowances for tiles the client hasn’t selected yet, and the validity period of the price.
do tilers need to tender for commercial work?
Larger commercial and multi-residential tiling packages are usually won by formal tender rather than a simple quote, particularly where a head contractor or client is comparing several tiling subcontractors against the same finishes schedule and specification. Smaller commercial and all residential work is typically priced as a straightforward quote.
how much wastage should you allow for tiling?
Wastage allowances for tiling typically increase with the complexity of the lay pattern and the size of the tile — a simple grid pattern needs less allowance than a diagonal or herringbone lay, and large-format tiles cut around fixtures generate more offcut loss. Measuring the exact areas and lay pattern from the plans, rather than guessing a flat percentage, gives a more accurate allowance for each room.
Ready to win more work?
Turn your plans into professional tenders 60–75% faster with My Trade Hub. Plans built around your tendering volume — no lock-in contracts.
Get started free